The purpose of this research is to define basic parameters of Tuul River and its catchment area using satellite images. The study has been done by two datasets 1) Shuttle Radar Topography Mission (SRTM) at a horizonta...The purpose of this research is to define basic parameters of Tuul River and its catchment area using satellite images. The study has been done by two datasets 1) Shuttle Radar Topography Mission (SRTM) at a horizontal spatial resolution of 90 meters, 2) The Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) at a horizontal spatial resolution of 30 meters, using two different models of ArcHydro and Integrated Land and Water Information System (ILWIS) softwares. Main methods of models, that were used in this research are the Deterministic-8, the steepest slope, the spread, the seek computations and the trace analysis. Moreover, input data of the modeling are digital elevation model (DEM) and outlet location of the river. DEM based ArcHydro model was run on the both datasets, and ILWIS model was run on SRTM data. Several intermediate results were produced while the models run, and basic parameters of the Tuul River, its catchment area have been defined at the end of the model. Moreover, final results of the models were compared with each other and with the result of previous research. The result of this study can be used in baseline and advanced research on the catchment area. Besides of that, the result can define a spatial boundary of study on Tuul River and its catchment area. Moreover, it would have support for decision-making on ground and surface water resource, distribution and management. Further research, which will cover the entire territory of Mongolia, has to be done using same methodology. The 332nd decision on “River catchment areas of Mongolia” of the Minister of Nature, Environment and Tourism in 2009 has to renew, if a result of that study would be accepted from vocational organization and experts.展开更多
This paper analyses the spacial distribution, quantity-scale, function-structure and facilities from the angle of spacial organizational optimizing theory and sustainable development thought. The authors point out the...This paper analyses the spacial distribution, quantity-scale, function-structure and facilities from the angle of spacial organizational optimizing theory and sustainable development thought. The authors point out the distributional principles of rural settlements in plain areas, and put forward planning and distribution of various levels of rural settlements (central villages, basic villages and natural villages).展开更多
Water supply capability has been significantly reduced as water demand has been increased due to changes of the world's weather, causing the increase of drought frequency, and urbanization. In terms of water produ...Water supply capability has been significantly reduced as water demand has been increased due to changes of the world's weather, causing the increase of drought frequency, and urbanization. In terms of water production, water can be secured by construction a dam or procuring substitute water. However, the study approaches in terms of management of water supply area to control the existing water efficiently. Therefore, water demand was estimated by buildings, by which water load of micro water supply area was calculated. As a result, the deviation of water demand for 1,357 micro water supply areas could be calculated while the alternatives to dissolve the spatial demand unbalance were suggested by two types. From the study, firstly, we could anticipate the total water supply demand from the total sum by filtration plants but it was not possible to anticipate the characteristics of distribution within urban areas. For this, the study attempted to anticipate the demand of each 250 thousands of buildings, comprehending the demand of micro areas. Secondly, based on the built results, we suggest the directions to dissolve the water demand unbalance between and among regions, which could be the foundation to suggest the concrete methodology in the future.展开更多
BACKGROUND In rotator cuff repair surgery,the double-row technique is widely performed.Studies have shown that with increased contact area and pressure between tendon and bone interface,better healing is promoted.AIM ...BACKGROUND In rotator cuff repair surgery,the double-row technique is widely performed.Studies have shown that with increased contact area and pressure between tendon and bone interface,better healing is promoted.AIM To assess the different suture configurations with the double-row technique and how this influences the contact area of the rotator cuff tendon to bone.METHODS This was a controlled laboratory study where identical tears were created in 24 fresh porcine shoulders over a 1.5 cm×2.5 cm infraspinatus insertion footprint.Double-row repair techniques,with 3 to 4-suture anchors in different configurations(2 medial,2 lateral vs 2 medial,1 lateral vs 1 medial,2 lateral),were employed for three control groups.Each group consisted of eight shoulders with identical repair configurations.Footprint contact areas of the repaired tendon against the tuberosity were determined using pressure sensitive Fujifilm placed between the tendon and tuberosity.RESULTS The mean contact area between tendon and insertion footprint from the imprinted Fujifilm was obtained using computer software.The contact area measured from a standard 4-suture anchor double row repair was 75.1±9.3 mm2,whereas areas obtained for the 2 lateral-1 medial and 2 medial-1 lateral anchor configurations were 72.9±5.2 mm2 and 75.0±4.9 mm2 respectively.No statistical significance was noted between the three groups.CONCLUSION In the technique of double-row repair,using a 3-suture anchor configuration may offer a non-inferior alternative to the standard 4-anchor construct in terms of efficacy.This may also result in overall cost reduction and shorter surgical time.展开更多
文摘The purpose of this research is to define basic parameters of Tuul River and its catchment area using satellite images. The study has been done by two datasets 1) Shuttle Radar Topography Mission (SRTM) at a horizontal spatial resolution of 90 meters, 2) The Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) at a horizontal spatial resolution of 30 meters, using two different models of ArcHydro and Integrated Land and Water Information System (ILWIS) softwares. Main methods of models, that were used in this research are the Deterministic-8, the steepest slope, the spread, the seek computations and the trace analysis. Moreover, input data of the modeling are digital elevation model (DEM) and outlet location of the river. DEM based ArcHydro model was run on the both datasets, and ILWIS model was run on SRTM data. Several intermediate results were produced while the models run, and basic parameters of the Tuul River, its catchment area have been defined at the end of the model. Moreover, final results of the models were compared with each other and with the result of previous research. The result of this study can be used in baseline and advanced research on the catchment area. Besides of that, the result can define a spatial boundary of study on Tuul River and its catchment area. Moreover, it would have support for decision-making on ground and surface water resource, distribution and management. Further research, which will cover the entire territory of Mongolia, has to be done using same methodology. The 332nd decision on “River catchment areas of Mongolia” of the Minister of Nature, Environment and Tourism in 2009 has to renew, if a result of that study would be accepted from vocational organization and experts.
基金Under the auspices of the National Natural Science Foundation of China (No.49771031)51-A1-204, KZ95T-06).
文摘This paper analyses the spacial distribution, quantity-scale, function-structure and facilities from the angle of spacial organizational optimizing theory and sustainable development thought. The authors point out the distributional principles of rural settlements in plain areas, and put forward planning and distribution of various levels of rural settlements (central villages, basic villages and natural villages).
文摘Water supply capability has been significantly reduced as water demand has been increased due to changes of the world's weather, causing the increase of drought frequency, and urbanization. In terms of water production, water can be secured by construction a dam or procuring substitute water. However, the study approaches in terms of management of water supply area to control the existing water efficiently. Therefore, water demand was estimated by buildings, by which water load of micro water supply area was calculated. As a result, the deviation of water demand for 1,357 micro water supply areas could be calculated while the alternatives to dissolve the spatial demand unbalance were suggested by two types. From the study, firstly, we could anticipate the total water supply demand from the total sum by filtration plants but it was not possible to anticipate the characteristics of distribution within urban areas. For this, the study attempted to anticipate the demand of each 250 thousands of buildings, comprehending the demand of micro areas. Secondly, based on the built results, we suggest the directions to dissolve the water demand unbalance between and among regions, which could be the foundation to suggest the concrete methodology in the future.
文摘BACKGROUND In rotator cuff repair surgery,the double-row technique is widely performed.Studies have shown that with increased contact area and pressure between tendon and bone interface,better healing is promoted.AIM To assess the different suture configurations with the double-row technique and how this influences the contact area of the rotator cuff tendon to bone.METHODS This was a controlled laboratory study where identical tears were created in 24 fresh porcine shoulders over a 1.5 cm×2.5 cm infraspinatus insertion footprint.Double-row repair techniques,with 3 to 4-suture anchors in different configurations(2 medial,2 lateral vs 2 medial,1 lateral vs 1 medial,2 lateral),were employed for three control groups.Each group consisted of eight shoulders with identical repair configurations.Footprint contact areas of the repaired tendon against the tuberosity were determined using pressure sensitive Fujifilm placed between the tendon and tuberosity.RESULTS The mean contact area between tendon and insertion footprint from the imprinted Fujifilm was obtained using computer software.The contact area measured from a standard 4-suture anchor double row repair was 75.1±9.3 mm2,whereas areas obtained for the 2 lateral-1 medial and 2 medial-1 lateral anchor configurations were 72.9±5.2 mm2 and 75.0±4.9 mm2 respectively.No statistical significance was noted between the three groups.CONCLUSION In the technique of double-row repair,using a 3-suture anchor configuration may offer a non-inferior alternative to the standard 4-anchor construct in terms of efficacy.This may also result in overall cost reduction and shorter surgical time.