砖混结构综合楼整体迁移抬升工程关键施工技术 被引量:8

KEY CONSTRUCTION TECHNOLOGY FOR INTEGRAL SHIFT AND LIFT WORK OF BRICK-AND-CONCRETE COMPLEX BUILDING
在线阅读 下载PDF
导出
摘要 平顶山储备库综合楼需整体迁移并抬高0.45m,采用迁移抬升一次到位的施工方案,即托换加固体系及牵引轨道形成一定的上升坡度,直接至设计标高。与传统方法相比,该方案具有牵引设备用量少、易于控制、工期短、造价低等优点,但精度要求高,且要考虑建筑物沿坡度的下滑力对设备及安全性的影响。 Pingdingshan storage complex building needs to be shifted and lifted by 0.45m as a whole. Method of shifting and lifting simultaneously is adopted, that is, making the underpinning system and traction track form a fixed slope directly up to the design level. Compared with traditional method, this plan has the advantages of less traction equipment, easy control, timesaving and low cost. But high precision is required while the impact of down-sliding force of the building along the slope on the equipment and safety has to be taken into account.
出处 《建筑技术》 北大核心 2004年第6期423-426,共4页 Architecture Technology
关键词 砖混结构 整体迁移 托换技术 brick-and-concrete structure integral shift underpinning technology
  • 相关文献

参考文献6

二级参考文献2

共引文献40

同被引文献22

引证文献8

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部