期刊文献+

第一台真空内扭摆磁铁的设计与研制 被引量:1

Design and Construction of the First In-Vacuum Wiggler
原文传递
导出
摘要 主要介绍了北京正负电子对撞机上为提高同步辐射光源性能而设计建造的第一台真空内扭摆磁铁的概况 ,论述了真空内扭摆磁铁的设计要求和参数 ,以及研制过程中的关键技术和难度 。 The general features of the first in-vacuum wiggler designed and constructed in Beijing Electron Positron Collider (BEPC) as a part of the BSRF upgrade project are introduced. The measured magnetic field of the in-vacuum wiggler reaches 2.0 Tesla when operated at the gap of 12mm, which will provide high flux in the hard X-ray region and will be mainly used for the high temperature and high pressure diffraction experiments. The key technologies and difficulties for the magnetic and mechanical design of the in-vacuum wiggler are described. The main parameters and the requirements for the in-vacuum wiggler are given too. Also, the magnetic field measurement results are shown.
出处 《高能物理与核物理》 CSCD 北大核心 2004年第6期637-643,共7页 High Energy Physics and Nuclear Physics
关键词 同步辐射 真空内扭摆磁铁 磁场测量 北京正负电子对撞机 设计参数 synchrotron radiation, in-vacuum wiggler, magnetic field measurement
  • 相关文献

参考文献9

  • 1Walker R P,Diviacco B.Synchrotron Radiation News,2000,13(1)
  • 2Stefan P M et al.J.Synchrotron Rad.,1998,5:417-419
  • 3Hideo Kitamura J.Synchrotron Rad.,1998,5: 184-188
  • 4Shigeru Yamamoto et al.Journal of Applied Physics,1993
  • 5Halbach K.Sixteen Lectures Presented from October 1988 to March 1989
  • 6LIU Mao-San et al.HEP & NP,1984,8(1) :59-68(in Chinese)(刘茂三等.高能物理与核物理,1984,8(1):59-68)
  • 7WANG Pei-Wei et al.HEP & NP,1996,20(5):468-475(in Chinese )(王培玮等.高能物理与核物理,1996,20(5):468-475)
  • 8SHI Cai-Tu et al.Proceedings of the Second Asian Particle Accelerator Conference,Beijing,China,2001
  • 9Hara T et al.J.Synchrotron Rad.,1998,5:403-405

同被引文献5

  • 1周利娟.BEPCII储存环高频屏蔽波纹管发热实验[J].真空,2005,42(2):49-52. 被引量:3
  • 2周德民,石才土.加耦合腔后4W2阻抗测量[R].北京:中科院高能物理研究所,2006.
  • 3盛树刚,曹云.4W2真空内扭摆磁铁耦合腔及移动装置设计[R].上海:上海交通大学,2004.
  • 4Chao A W, Tigner M. Hand book of accelerator physics and engineering [M]. Singapore: World Scientific Publishing Co. Pte. Ltd, 1999: 212-213.
  • 5Wang J Q, Ma L, Zhang C. The second phase commissioning of BEPC I/ [C]//Proceedings of the 40th ICFA Advanced Beam Dynamics Workshop on e+e- Factories. Novosibirsk, 2008.

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部