期刊文献+

桥梁加固工程生命周期成本横向对比分析 被引量:44

Comparative analysis of life-cycle cost for bridges strengthening
在线阅读 下载PDF
导出
摘要 通过比较加固桥梁与新建桥梁诸多方面的差异,对加固桥梁和新建桥梁的生命周期成本进行了横向对比分析,采用年值成本差(ACD)和年值成本比(ACR)两个经济指标评价桥梁加固工程的经济性。提出了基于桥梁加固工程生命周期成本分析的评价方法,并给出了应用算例,由计算结果可知该方法能较准确的反映桥梁加固工程的经济效果。 The paper researched the many-sided difference of strengthening and new bridge, and transversely analyzed the life-cycle cost of strengthening and new bridges. Two economic indicators (ACD and ACR) are adopted to evaluate the economy of bridges strengthening. This paper presented an evaluation method based on life-cycle cost analysis of bridges strengthening, and given a computational example. The calculation result indicates that this method can exactly evaluate the economy of bridges strengthening.
作者 徐岳 武同乐
出处 《长安大学学报(自然科学版)》 EI CAS CSCD 北大核心 2004年第3期30-34,共5页 Journal of Chang’an University(Natural Science Edition)
基金 国家西部交通建设科技项目(200131822358)
关键词 桥梁工程 桥梁加固 生命周期成本 经济性评价 年值成本差 年值成本比 bridge engineering structure strengthening life-cycle cost economy evaluation
  • 相关文献

参考文献6

二级参考文献13

  • 1张坤民.可持续发展从概念到行动[J].世界环境,1996(1):3-6. 被引量:20
  • 2[1]T.R.Kuesel.What Happened to Long Term Bridge Design? Proc.,Engineering Foundation Conference: Managing America' s Aging Bridges, Palm Coast, Fla., 1989.
  • 3[2]R.L. Nickerson and D.Veshosky. Highway Bridges-Life Cycle Cost versus Life Cycle Performance: Decision Criteria for Bridge Selection.9th Annual International Bridge Conference. Pitts-burht. Pa.,1992.
  • 4[3]D.Veshosky and C.R. Beidleman. Life-Cycle Cost Analysis Doesn' t Work for Bridges. Civil Engineering. July 1992.
  • 5[4]Bridge Management. Road Transport Research Report. Organi-zation for Economic Co-Operation and Development. Paris. France, 1992.
  • 6[5]J.Llanos. La Gestion des Pouts aux Etats-Unis, Revue Generale des Routes et des Aerodromes, No.687, July-Aug, 1991.
  • 7[6]M.Cesare, C.Santamarina, C.Turkstra, and E.Vanmarcke. Probabilistic Models for Bridge Evaluation and Management.Proc., 2nd Civil Engineering Automation Conference, New York, N.Y., Nov, 1991.
  • 8[7]J.Llanos and B.Yanev.Models of Deck Deterioration and Optimal Repair Strategies for the New York City Bridges. Proc., 2nd Civil Engineering Automation Conference, New York, N.Y., Nov, 1991.
  • 9[8]K.E.Giles. A Micro-Computer Aided Bridge Needs Forecasting Systenm.Presented at 5th Annual Workshop on Bridge Management Systems, TRB, National Research Council, Washington, D.C., 1991.
  • 10[1]Stephanie E., et al. Life-cycle cost analysis with natural hazard risk[J]. Journal of Infrastructrue, 1996, 10(3): 118-126.

共引文献38

同被引文献690

引证文献44

二级引证文献761

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部