期刊文献+

综合超前地质预报在圆梁山隧道中的应用 被引量:60

Comprehensive advance geology prediction adopted in Yuanliangshan tunnel
在线阅读 下载PDF
导出
摘要 圆梁山隧道通过地段岩溶发育、水流量大、水压高 ,断层破碎带多且含有煤层、瓦斯、石油天燃气 ,地质条件非常复杂。施工过程中采用了包括TSP2 0 2、红外探测、地质雷达、HSP、常规地质分析和超前水平钻孔多种方法相互印证和补充的综合地质预报。 Yuanliangshan tunnel passes through a section with complicated geological condition, rich in karst and underground water with high pressure, with many faults and fractured zones in which encountered coal layers, gas and natural petroleum gas. In the process of construction a comprehensive geological prediction was adopted including: TSP 202, infrared ray detection, geologic radar, HSP, regular geologic analysis and advance horizontal boring, which verify and supplement one another. The paper introduces the geological prediction adopted in Yuanliangshan tunnel.
作者 王洪勇
机构地区 中铁隧道设计院
出处 《现代隧道技术》 EI 2004年第3期55-61,共7页 Modern Tunnelling Technology
关键词 圆梁山隧道 岩溶隧道 超前地质预报 Yuanliangshan tunnel Karst tunnels Geological fore-cast
  • 相关文献

同被引文献276

引证文献60

二级引证文献402

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部