摘要
结合超前地质预报技术在金瓜山隧道施工项目中的应用,具体论述了综合超前地质预报体系的设计思想以及所采用的TSP、雷达探测、超前钻探、地质素描等预报方法的工作原理和实施步骤,并分析了各种方法的特点。
Combined with the application of advanced geological forecast technology in Jinguashan Tunnel construction, the design ideas of comprehensive advanced geological forecast system was expounded.The working principle,operating steps and characteristics of the forecast methods were discussed,such as TSP(Tunnel Seismic Prediction),radar detection,advance borehole,geological sketch and so on.The successful application of comprehensive advanced geological forecast technology can provide guide and reference for tunnel construction.
出处
《筑路机械与施工机械化》
2012年第7期83-85,88,共4页
Road Machinery & Construction Mechanization
关键词
隧道
综合地质预报
探测技术
技术特点
tunnel
comprehensive geological forecast
detection technology
technical characteristic