摘要
针对资源利用时间效益的重要性,提出在无底柱分段崩落法中矿块的提前获利措施,由此产生矿块投产效益的综合优化。并引用电算模拟和方案评价法对矿块投产效益作半定量化选优。
As far as utilization of ore resource is concerned, time efficiency is very important. To benefit ahead of time from ore bodies in caving stope without sill pillar, some measures have been put forward. Through computer simulation and scheme evaluation, the commissioning efficiency of ore bodies
is optimized semiquantitatively.