摘要
简述那力水电站原设计方案,针对其不足,结合地形、地质条件,对引水隧洞、压力前池、泄水陡坡进行优化设计,优化后节省工程投资200万元,效果良好。
Briefly discussed the original design scheme of the Nali power station,in view of its shortage, combining with the topography and geologic condition, the conduit tunnel, pressure pool and discharging slope were optimum designed, saved project investion 2 million yuan and the effect was well.
出处
《广西水利水电》
2004年第1期27-29,共3页
Guangxi Water Resources & Hydropower Engineering