摘要
应用多目标模糊综合评判对施工中的关键环节—两层粘土衬层的施工进行指导和预测,选取符合设计要求、经济实用的最优方案.
The industry solid hazardous waste handle centre of Shenyang city adopts safe land filling technology to the solid hazardous waste of industry, Preventing dialysis liquid from Infiltration for the sake of the groundwater.This paper applies multi-objects fuzzy comprehensive evaluation to guide and predict the key cnstructinglink - the construction of two layer clay lining and chooses optimum scheme according with the designing requirement and economical and practical principles.