摘要
上海广场工程坐落在地铁隧道上方,施工场地狭小,施工中必须采取基坑加固措施,采用合理的土方开挖顺序及信息化施工保护隧道不受影响。
The Shanghai Plaza project is just above a subway tunnel and its construction field is very small. In construction of the project, engineers must adopt foundation ditch strengthening measures, a proper soil excavation sequence and information construction methods to ensure the subway tunnel not to be influenced.
出处
《施工技术》
CAS
北大核心
2004年第1期35-37,共3页
Construction Technology
关键词
地铁隧道
深基坑
基坑加固
信息化施工
underground engineering
tunnel
foundation ditch strengthening
information construction