摘要
提出用POA算法解决水电站机组间有功功率最优分配问题,实例研究表明:该方法具有计算速度快、精度高、直接使用效率特性曲线等优点,可用于实时在线控制。
Using the POA algorithm to solve the optimal distribution problem of active power among the sets of a hydropower plant is presented for the first time. The study of practical examples shows that this algorithm has the advantages of rapid computing velocity, high accuracy and directly using the efficiency curve etc. and can be used in real time control.
关键词
水电站
POA算法
运行
优化
hydroelectric stations
economic distribution of active power
optimization algorithm