摘要
本文提出了梯级水电站群补偿调节的大系统分解协调算法,并以汉江上游石泉安康梯级水电站为例,给出了计算结果。
A new algorithm of decomposation and coordination for cascade hydropower stations is proposed in this paper. The optimization result from the outputs of SQ-AK cascade hydropower stations located on the upstream of the Han River is given.
关键词
梯级水电站群
POA算法
关联平衡法
cascade hydropower stations, firm output powcr, POA algorithm, interactive balance method