三峡泄洪坝段混凝土施工计算机模拟 被引量:4

Computer Simulation for Concrete Construction of the Spillway Dam of the Three Gorges Project
原文传递
导出
摘要 对三峡工程泄洪坝段混凝土通仓浇筑,建立了模拟混凝土施工过程的整体模型。建模从国内施工水平出发,考虑坝段分区、机械设备故障率、运料车排队长度限额等因素,以塔机为中心机械,按台班配备运料车,就六个模拟方案中按工期费用标准优选出机械配套方案。其成果对三峡工程有一定的参考价值。 An entire model simulating concrete construction process in combination with the concrete pouring without longitudinal, joints of the Three Gorges Project spillway dam is established. According to the present construction level, some factors are considered at the time of modelling, such as, dam length division, mechanical breakd6wn, and the queue limitation of concrete vehicles, etc. The amount of concrete vehicles is determined in shifts in accordance with the number of cranes used as central machines. According to the rules of time—cost norm, an optimum scheme of complete set of machines is selected from 6 alternatives. The results obtained are available for certain reference value, to the spillway dam construction of the Three Gorges Project.
出处 《武汉水利电力学院学报》 CSCD 1992年第1期38-44,共7页
关键词 混凝土 施工 计算机模拟 concrete dams construction scheme computer simulation Three Gorges Project
  • 相关文献

参考文献2

共引文献14

同被引文献27

引证文献4

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部