摘要
针对水电站大坝混凝土浇筑施工方案,进行了仿真模拟计算,得出混凝土施工强度、施工机械利用情况、不均匀系数、施工进度、施工形象面貌等结果,并进行分析及模拟结果的可视化,帮助设计人员直观分析施工方案的合理性,并作出方案的优化.
The simulation of the dam construction for Xiangjiaba Hydropower Project is studied in accordance with the construction program hereinafter; from which the intensity of construction, the utilization factor of the construction equipments, the asymmetry coefficient, the construction schedule and the dynamic appearances of the construction are obtained. On the basis of this, the simulated results are visualized and analyzed as well, and then the construction scheme can be intuitively analyzed whether it is reasonable or not with the appearances given. In this way, the construction scheme can be optimized at last.
出处
《水利水电技术》
CSCD
北大核心
2005年第4期117-119,共3页
Water Resources and Hydropower Engineering
关键词
混凝土浇筑
仿真
向家坝水电工程
concrete placement
simulation
Xiangjiaba Hydropower Project