期刊文献+

水电站厂坝交界处大直径钢管取消伸缩节论证 被引量:3

Strain Analysis on Large Powerhouse Penstock Without an Expansion Joint
全文增补中
导出
摘要 本文介绍了国内外坝后式厂房取消厂坝间钢管伸缩节的工程实例,以有限元法计算了五强溪厂坝结构在常规荷载与温变荷载作用下的结构位移,并进行了各种计算条件与参数的敏感性分析,导出了结构位移与钢管附加应力间的关系,通过组合应力分析,说明在一定条件下,五强溪水电站引水钢管取消厂坝间伸缩节是可能的。 Examples at home and abroad of penstock without an expansion joint between dam and the following powerhouse are described in this paper. Wuqangxi dam and plant displacement under normal and thermal loads is calculated by 3-dimension finite element method.The sensitivity to various computational conditions & parameters is analysed. The relationships between the displacement and corresponding stresses produced in penstock are given. The combined stress analysis indicates that it's possible for Wuqangxi powerhouse penstock to be constructed without an expansion joint by taking some technological measures.
出处 《水力发电学报》 EI CSCD 北大核心 1991年第2期29-38,共10页 Journal of Hydroelectric Engineering
  • 相关文献

参考文献1

  • 1董哲仁.下游坝面压力管道的强度安全系数[J]水利水电技术,1988(10).

同被引文献32

  • 1王春涛,李振富.万家寨水电站取消发电引水管道伸缩节的焊接时机选择[J].水力发电学报,2004,23(4):55-59. 被引量:7
  • 2傅金筑,张淑婵.李家峡水电站钢管取消伸缩节论证[J].青海水力发电,1994(3):5-10. 被引量:2
  • 3刘宪亮,董毓新,何长利.大型坝后式水电站厂坝联结形式的优选[J].水利学报,1995,27(8):39-45. 被引量:5
  • 4吴海林,伍鹤皋,张伟,王从保.水电站厂坝联结形式与取消伸缩节研究[J].水力发电学报,2006,25(2):118-122. 被引量:13
  • 5李佛炎.五强溪水电站压力钢管取消伸缩节可行性研究报告[R].能源部水利部中南勘测设计院,1990.
  • 6Dai Huichao,Tian Bin.Design Calculation of"Soft" Gasket in Penstock Intended for Replacement of the Ex-pansion Joint in.Place of Abutment of Dam to Power House[C]//New Developments in Dam Engineering-Wieland.London:2004:273-280.
  • 7邱彬如.安康水电站运转期坝体温度变形计算和取消钢管伸缩节的分析.水利水电勘测设计,1986,(1):15-160.
  • 8董哲仁.五强溪水电站取消厂坝间钢管伸缩节论证报告[R].中国科学院水利水电科学研究院结构材料所,1989.
  • 9傅金筑.张淑婵.黄河李家峡水电站发电引水钢管取消伸缩节论证报告[R].能源部水利部西北勘测设计研究院,1994.
  • 10张淑婵,张文辉,傅金筑.李家峡水电站发电引水钢管取消伸缩节观测测试计算论证研究报告[R].国家电力公司西北勘测设计研究院,2000.