摘要
双套管正压浓相除灰系统是北京国电电力建设研究所控股的北京国电富通科技发展有限公司研发的锅炉除灰技术,用于火电厂锅炉的干除灰。该系统在实际运行时,开始存在一些不足,通过在实际生产过程中的不断完善,它已满足了电厂生产的需要。该系统通过调试和运行,已在徐州发电厂4号炉安全、稳定地运行。
The double - socket positive pressure dense phase ash disposal system is an ash disposal technique of boilers developed by Beijing Guodian Futong Technology Development Ltd. Com. held by Beijing SG Electric Power Construction Research Institute. The technique is mainly used for dry ash disposal of boiler in thermal power plants. In operation of very beginning the system started with some shortcomings and through improvement in production process it can meet the demand of production. Through adjustment and operation the system is now under safe and stable operation for No.4 unit in Xuzhou Power Plant.
出处
《电力建设》
北大核心
2004年第1期12-15,共4页
Electric Power Construction
关键词
火电厂
锅炉
双套管正压浓相除灰系统
集中控制系统
可编程序控制器
double - socket positive pressure dense phase ash disposal system
application
operation analysis
improvement