3Dick Fisher.The Cause of Runner Crack and the Solution Implement for the Xiaolangdi Hydroelectric Project[A].Proceedings of the Hydraulic Machinery and systems 21th IAHR Symposium[C].Semtember 9 ~ 12,2002,Lausanne.
4M.FARHAT.Onboard Measurements of Pressure and strain Fluctuations in a Model of Low Head Francis Turbine Part1:Instrumentation[A].Proceedings of the Hydraulic Machinery and systems 21th IAHR Symposium[C].Semtember 9 ~ 12,2002,Lausanne.
5PYLOWYS.Onboard measurements of pressure and strain fluctuations in a model of low head francis turbine Part1:meaurements and analysis results[A].proceedings of the hydraulic machinery and systems 21th IAHR symposium[C].Semtember 9 ~ 12,2002,Lausanne.
6依瓦锘夫等.混流式水轮机转轮可靠性的确定(俄)[J].水工建筑,2001,5.
7Dick Fisher.The Cause of Rumer Crack and the Solution Implement for the Xiaolangdi Hydroelectric Project[A].Proceedings of the Hydraulic Machinery and systems 21th IAHR Symposium[C].Lausanne:2002,9:9~12.
8Manson S S.Fatigue Behaviour in Strain Cycling in the Lowand Inter-Cycle Range[J].Fatigue-An Interdisciplinary Approach,Syracuse University Press,1964.