摘要
本文着重叙述了在预应力轨枕模型和拉压双应力桥梁模型上采用环槽法和盲孔法测量模型预应力的方法,以及有关的分析计算结果.
Grooving and hole drilling method used in measuring prestressing force in prestressed concrete structure members are described.Models of Prestressed sleeper and dual(stretched and compressed)prestressed bridge beam are measured.The dispersion of measuring data is small.Results obtained agree very well with those from calculation,their relative error is less than 20%.
出处
《实验力学》
CSCD
北大核心
1992年第4期357-363,共7页
Journal of Experimental Mechanics
关键词
预应力
应力释放法
预应力混凝土
prestress
stress release method
hole drilling method
grooving method