摘要 以江苏省电网调度中心工程为例 ,用有限元法仿真计算了基础底板大体积混凝土施工期温度场 ,并在混凝土中埋入温度传感器 ,实时监测温度场的变化。实测数据与有限元计算结果偏差较小 ,说明有限元仿真计算能有效地预测施工期温度场的变化 ,帮助工程师拟定温控方案 ,防止温度裂缝的产生。 Taking the building of electric power dispatching for example,this paper discusses how to use finite element method to calculate temperature field during the construction process of massive concrete.Temperature sensors were embedded to monitor the variety of temperature field.The discrepancy between data from monitoring and data from calculating is small,which illustrates that we can effectively forecast the variety of temperature field and draw out temperature control scheme using finite element method to prevent temperature cracking.
出处 《建筑结构》 CSCD 北大核心 2003年第10期49-52,共4页 Building Structure
关键词 高层建筑 基础底板 大体积混凝土 温度裂缝 温度场 有限元 实时监测 massive concrete crack control temperature field finite element method real time monitoring
  • 相关文献

参考文献3

  • 1叶琳昌 沈义.大体积混凝土施工[M].中国建筑工业出版社,1992..
  • 2ANSYS INC. Ansys Thermal Analysis Guide.
  • 3ANSYS INC. Ansys APDL Guide.

共引文献2

同被引文献8

引证文献6

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部