摘要
结合某工程的概况和地质条件,从测量放线、资料整理、有关制度的执行等方面介绍了工程的质量保证措施,阐述了施工质量控制措施,并对其施工结果作了检验,显示满足设计要求。
Combined with general situation and geologic condition of a certain project, the author introduces the measures to ensure engineering quality from surveying setting-out, data processing and the implement of relevant systems, illustrates measures of construction quality control, and checks out its construction results, which is fit for the design requirement.
出处
《山西建筑》
2007年第1期85-86,共2页
Shanxi Architecture
关键词
测量放线
CFG桩
质量控制
地基承载力
surveying setting-out, CFG pile, quality control, bearing capacity of foundation