施工阶段监理机构对索赔的处理

Supervision Organ Dealing With Claims in Construction Phase
在线阅读 下载PDF
导出
摘要 水利工程建设工期长,技术难度大,设计变更和不可预见因素多,索赔在工程建设中难免发生,如何正确处理和解决工程建设中的索赔对工程的顺利开展至关重要.在索赔处理时,一般遵循先定性分析,后定量计算的方法,促使合同双方相互理解,以使问题得到顺利解决,使工程建设正常进行. Because of long water conservancy engineering construction time limit for a project,difficult techniques,design modification and many unforeseen factors,claims in the course of water conservancy engineering construction are hard to avoid.How to deal with and solve project construction claims is an important question for a supervision engineer.In the course of dealing with claims,follow the methods of qualitative analysis at first and then quantitative calculation in order to impel the two parties in the contract to comprehend each other and solve problems smoothly.
出处 《华北水利水电学院学报》 2003年第3期75-77,共3页 North China Institute of Water Conservancy and Hydroelectric Power
关键词 工程变更 索赔处理 施工监理 project modification dealing with claims construction supervision
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部