摘要
通过新增一套液化石油气裂解原料储运设施工艺系统的优化设计 ,提高了上海石化 2 #乙烯装置实际生产能力 ,并减少了裂解原料单耗和乙烯装置能耗。优化设计方案使本项目采用最少的基建投资和操作费用取得最大经济效益。
Through the new project of optimized design for process system of LPG crack raw material storage and handling facilities the actual capacity of 2# ethylene plant is increased and energy consumption for crack raw material consumption and for ethylene plant is reduced. The optimized design scheme enables this project to obtain maximum economic benefits with minimize construction investment and operation cost.
出处
《化工设计》
CAS
2003年第4期30-33,共4页
Chemical Engineering Design