摘要
介绍宜昌长江公路大桥主缆架设的施工工艺 ,并结合施工实际情况 ,探讨一些问题产生的原因和解决的办法。
Yichang Changjiang Highway Bridge is a project on the State Arterial Route that spans the Changjiang River.The main span of the bridge is a 960 m steel suspension bridge.Main cable is the main component of large scale modern suspension bridge.In this paper,main cable erection construction of Yichang Changjiang Highway Bridge is described,Meanwhile,it approachs the causes why those problems arised and the ways to solute them in the light of the practical situation of construction.
出处
《交通科技》
2003年第4期15-18,共4页
Transportation Science & Technology