期刊文献+

黄河干流梯级电站补偿效益初步研究 被引量:1

Pilot study on compensation benefit of cascade powerstationson main stream of the Yellow River
在线阅读 下载PDF
导出
摘要 根据黄河干流的实际和研究的需要,将全干流分为上、下两个子系统,并以发电量最大为目标建立模型,采用逐步优化算法(POA)进行计算求解。对比分析“有”“无”上游龙刘水库调节时给下游带来的供水及发电补偿效益,并提出了其初步分配方案,为决策部门提供了有效的数据参考依据。 Based on practical calculation demand, divided the main stream into up and down subsystems, used the maximum generation electricity as the objective to set up the model, adopted the POA method to solve the objective. Whether reservoir regulated in upstream or not, contrasted and analyzed compensation benefit of the reservoir in downstream, especially water supply and generation electricity compensation benefits. Put forward the pilot distribution project, this measure provides an effective data reference for decisionmaking department. 
出处 《西北水力发电》 2003年第2期1-4,共4页 Journal of Northwest Hydroelectric Power
关键词 补偿效益 黄河 供水效益 发电效益 逐步优化算法 compensation benefit the Yellow River water supply benefit generation electricity
  • 相关文献

参考文献2

二级参考文献14

共引文献21

同被引文献17

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部