装卸机械配合时间控制模型研究

Research of Time Control Model about Earthwork Mechanisation Associtate with Construction
在线阅读 下载PDF
导出
摘要 针对装卸机械联合作业过程中,型号不同多台辅助施工机械与主导施工机械配合施工完成单次土方作业循环时间参差不齐的情况,利用优化方法,建立了非同型号辅助施工机械完成单次土方作业循环时间控制模型. In allusion to earthwork mechanisation associtated with construction, when many auxiliary mechanisations are different and the circle time of them in finishing one-time earthwork work is not equal, we can build the model of circle-time controlling for different types of auxiliary mechanisations to finish one-time earthwork work, and it is used to make a series of calculation by living example, obtaining the optimal queue and circle time about the different types of auxiliry mechanisation with the major mechanisation associtated with construction.
作者 丁礼建
出处 《河北建筑工程学院学报》 CAS 2003年第2期47-50,共4页 Journal of Hebei Institute of Architecture and Civil Engineering
关键词 装卸机械 时间控制模型 排队序列 施工机械 土石方工程 机械化施工 construction mechanisation time control the queue.
  • 相关文献

参考文献2

  • 1[1]武振业.生产管理理论.成都:西南交通大学出版社,1990
  • 2[2]倪志锵.铁道工程机械化施工.北京:中国铁道出版社,1990