太湖地域百米厚层表土冻结法凿井实践 被引量:2

Practice of Shaft Sinking in Hundred Meter Thick Overburden by Freezing Method in Taihu Region
在线阅读 下载PDF
导出
摘要 风井选择位置地点第四系垂深 95 93m ,总涌水量 10 92m3 /h。原设计选用填砂袋打止浆垫方法凿井 ,实际施工失败。后改为冻结法凿井取得成功 ,阐述了冻结孔布置、冻结时间及冻壁强度及井壁质量影响因素 4个方面的问题。总结了冻结法施工的一些成功因素。 The airshaft was located in the Quartenary Period layer,with a vertical depth of 95.93 m and a total water inrush rate of 10.92 m 3/h.The method of slurry blocking pad of sand bags was used in shaft sinking according to the original design,which was proved to be unsuccessful in practical construction.Later,freezing method was applied instead and achieved success.The problems relating to the influential factors such as freezing hole layout,freezing time,freezing wall strength and wall quality are expounded.Some factors of success in shaft sinking by freezing method are summarized.
作者 姚志强
机构地区 小茅山铜铅锌矿
出处 《金属矿山》 CAS 北大核心 2003年第5期12-14,40,共4页 Metal Mine
关键词 风井 厚层表土 止浆垫 冻结法 凿井 井壁质量 冻结孔 Airshaft,Thick overburden,Slurry blocking pad,Freezing method
  • 相关文献

同被引文献8

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部