摘要
根据小浪底水电厂 AGC(自动发电控制 ) /AVC(自动电压控制 )的现场调试情况 ,对其软硬件配置结构、功能方式、主要负荷分配策略的实现及应用上所采用的一些方法进行了分析和说明 。
According to the field adjustment and testing of the AGC/AVC at Xiaolangdi Hydropower Plant, the configuration of the system, the control functions and modes, primary load distribution strategies and some adopted methods are analyzed in this paper. In addition, some existing problems are also pointed out on the basis of application of the AGC/AVC.
出处
《水电自动化与大坝监测》
2003年第2期10-13,共4页
HYDROPOWER AUTOMATION AND DAM MONITORING