介绍根据安钢三炼钢条件进行的钢水中间包流场水力模型实验及其应用。通过研究确定了中间挡墙的适宜高度和安装位置。由于钢水流场的优化 。
This paper introduces water model experiments of molten steel flow field in tundish and its practical application. The model was made by simulating the conditions at №3 Steelmaking Plant of Anyang Steel. Due to the determination of optimum dam and weir height and fixing position, molten steel flow field in tundish was optimized, resulting in an obvious decrease of inclusion rejection of slab.
出处
《钢铁研究》
CAS
2003年第2期13-15,共3页
Research on Iron and Steel
关键词
优化
铸坯夹杂
水模实验
挡墙
中间包
钢水流场
water model experiment dam and weir tundish molten steel flow field