摘要
介绍了鹤壁煤电股分有限公司第三煤矿北翼新副井井底车场交汇断层破碎带涌水注浆堵水施工工艺及效果
The construction technology of grouting and blocking water under ground vehicle park and effect on crossing fault broken zone are introduced.
出处
《煤炭技术》
CAS
2003年第1期51-52,共2页
Coal Technology
关键词
断层破碎带
涌水点
注浆堵水
含水层
施工工艺
堵水效果
fault
broken zone
pouring water point
grouting and blocking water
reform of water_bearing