摘要
通过对两个工程事故实例的原因分析,简述了岩溶复杂地质条件下沉管灌注桩、人工挖孔桩设计、施工中应注意的问题。
In this paper, two practical projects with handdug cast insite pile and pipe sinking cast insite pile foundation are introduced. The causes of the accidents are comprehensively analyzed, and several problems in design and construct are pointed out for a special notice.
出处
《贵州工业大学学报(自然科学版)》
CAS
2002年第6期56-59,共4页
Journal of Guizhou University of Technology(Natural Science Edition)