期刊文献+

人工挖孔桩基础工程质量问题分析与处理 被引量:5

Treatment for the accident of hand-dug cast-in-situ pile foundation
在线阅读 下载PDF
导出
摘要 论述某商住楼人工挖孔桩基础工程,经检测发现桩基工程存在承载力不足和桩身质量问题。根据桩基工程检测、钻探和施工资料,综合分析事故原因,提出基础的补救措施,并取得良好的使用效果。 In this paper ,a practical project with hand-dug cast  ̄in-situ pile foundation is introduced. The results of pile static load test and dynamic test showed the insufficency of pile vertical bearing capacity and the shaft defect problem. Based on the test ,geological conditions and construction material , remedical measures were adopted after comprehensively analysing the accident causes. In treating the problem , pile-soil interaction was taken into account. The good effects of use and economy were gained.
作者 王敏
出处 《岩土工程学报》 EI CAS CSCD 北大核心 1998年第2期63-65,共3页 Chinese Journal of Geotechnical Engineering
关键词 人工挖孔桩 工程质量 承载力 补救措施 处理 hand-dug cast-in-situ pile ,pile static load test ,dynamic pile test , settlement.
  • 相关文献

参考文献4

  • 1龚昌基,福建建筑,1996年,软土地基与基础工程专辑,39页
  • 2王祯俊,福建建筑,1996年,软土地基与基础工程专辑,66页
  • 3余斯复,福建建筑,1996年,软土地基与基础工程专辑,64页
  • 4团体著者,岩土工程手册,1994年,588页

同被引文献33

引证文献5

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部