摘要 在联合循环机组中,为避免可燃物在下游流道和空间内累积,保证燃机下游设备的安全,燃气轮机启动清吹是必要的安全操作。在不能可靠或直接测量下游流道内的可燃气体成分、浓度情况下,启动前进行足够长时间的清吹是唯一确保设备安全的手段。但F级燃机在采用单轴布置刚性连接的情况下,转子总重量高达百吨级,导致厂用电率的升高和启动灵活性的降低,因此需要合理地确定启动清吹时长。 In combined cycle units,to prevent the accumulation of combustibles in the downstream flow path and space and ensure the safety of downstream equipment of the gas turbine,startup purge of the gas turbine is a necessary safety operation.In situations where the combustible gas composition and concentration in the downstream flow path cannot be reliably or directly measured,a sufficiently long purge before startup is the only means to ensure equipment safety.However,in the case of F-class gas turbine with rigid connections in single-shaft arrangements,the total weight of the rotor often reaches several hundred tons,which can lead to an increase in auxiliary power consumption and a decrease in startup flexibility.Therefore,it is necessary to determine the duration of the startup purge reasonably.
作者 丁勇能 江峰 DING Yongneng;JIANG Feng(Hangzhou Huadian Jiangdong Thermal Co.,Ltd.,311228,Hangzhou,Zhejiang,China;Hangzhou Huadian Banshan Power Generation Co.,Ltd.,310015,Hangzhou,Zhejiang,China)
出处 《河北水利电力学院学报》 2025年第4期60-64,共5页 Journal of Hebei University Of Water Resources And Electric Engineering
基金 华电国际电力股份有限公司科技项目(HDPIKJ16-02-02)。
关键词 燃气轮机 余热锅炉 启动吹扫 时长 gas turbine waste heat boiler startup purge duration
  • 相关文献

参考文献8

二级参考文献32

  • 1古玉,彭定志,赵珂珂,范楚婷.“一带一路”沿线国家水电发展状况与潜力[J].水力发电学报,2020,39(3):11-21. 被引量:8
  • 2PG935IFA燃气轮机运行维护手册GE公司[K].
  • 3General Electric Company. SPEEDTRONIC Mark VI Turbine Control[Z ].2004.
  • 4曾奕强,范雪飞,陈洪溪.PG9171E燃机改用双燃料系统的探讨[J].燃气轮机技术,2007,20(3):69-72. 被引量:4
  • 5FPA 85-2007, Boiler and Combustion Systems Hazards Code [ S ].
  • 6DL/T384-2010,9FA燃气一蒸汽联合循环机组运行规程[S].
  • 7任其智.燃气轮机的检修[M].北京:机械工业出版社,2011.
  • 8National FiE Protection Association. NFPA 8506 Standard on Heat Recovery Steam Generator System 1998 Edition [ S]. USA. 1998.
  • 9National Fire Protection Association. NFPA 85 Boiler and Combustion systems hazards code 2001 Edition [ S]. USA. 2001.
  • 10Internation Standerd Organization. ISO 3977 Gas Turbines - Procurement [ S].

共引文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部