摘要
某高速公路隧道在施工过程中出现了二次衬砌开裂、施工缝张开错台等病害,通过分析病害产生的原因,提出采取临时拱架支护、围岩注浆加固、换拱、洞外消坡减载等综合处治方案。监测结果表明:该方案可以有效地处治施工过程中出现的初支侵限、二衬开裂及错台等病害,可保证隧道施工的安全进行。
During the construction of a highway tunnel,diseases such as cracking of secondary lining and dislocation of construction joints observed have occurred.Through analysis of the causes of these diseases,a comprehensive treatment plan is proposed,including temporary arch support,grouting reinforcement of surrounding rock,arch replacement,and cutting slope&unloading outside the tunnel.Monitoring results demonstrate that,this solution effectively addresses construction issues such as initial support encroachment,secondary lining cracking,and joint dislocation,which can ensure the safe construction of the tunnel.
作者
渠建伟
胡涛
QU Jianwei;HU Tao(China Railway City Development and Investment Group Co.,Ltd.,Chengdu 610000,China)
出处
《路基工程》
2025年第4期232-236,共5页
Subgrade Engineering
关键词
高速公路
病害分析
支护加固
综合处治
监控量测
安全性
highway
disease analysis
support reinforcement
comprehensive treatment
monitoring measurement
safety