摘要
本文探讨了桥梁工程建设中40mT梁运输与安装施工技术的关键环节和技术要点。结合工程实践,本文详细分析了T梁的运输方法、安装工艺以及施工过程中的关键技术要点,总结了架桥机的使用与调试、40mT梁在运输过程中的加固措施以及安装施工中的吊装方法等方面的重要技术。通过对实际工程案例的分析,本文验证了所提出施工技术方案的可行性和有效性,并提出了施工过程中的质量控制措施。本文的研究对于指导桥梁工程建设中40mT梁的运输与安装施工具有重要的理论意义和实践价值。
This article explores the key links and technical points of transportation and installation construction technology for 40m T-beams in bridge engineering construction.Based on engineering practice,this article provides a detailed analysis of the transportation method,installation process,and key technical points during the construction of T-beams.It summarizes important technologies such as the use and commissioning of bridge erecting machines,reinforcement measures for 40m T-beams during transportation,and lifting methods during installation and construction.Through the analysis of actual engineering cases,this article verifies the feasibility and effectiveness of the proposed construction technology scheme,and proposes quality control measures during the construction process.The research in this article has important theoretical significance and practical value for guiding the transportation and installation of 40m T-beams in bridge engineering construction.
作者
王永华
WANG Yong-hua(Sichuan Road and Waterway Construction Engineering Co.,Ltd.,Chengdu 610000,China)
出处
《价值工程》
2025年第24期92-94,共3页
Value Engineering
关键词
桥梁工程
架桥机
预制T梁
T梁运输
T梁安装
bridge engineering
bridge erecting machine
prefabricated T-beam
transportation of T-beam
installation of T-beam