摘要
高速公路施工难度大、周期长,施工单位需积极采取预制处理技术,应用桥梁预制T梁施工技术方案,配合完整的工艺流程,以提高工程项目综合质量。文章以某高速公路桥梁结构为研究对象,探讨高速公路桥梁预制T梁施工流程及技术方案,旨在提高高速公路整体施工项目安全水平,全面提高高速公路T梁施工效率。
Highway construction is difficult and has long cycle. Construction units need to actively adopt prefabricated treatment technology, apply bridge prefabricated T beam construction technology scheme, and cooperate with the complete technological process to improve the comprehensive quality of the project. Taking a highway bridge structure as the research object, this paper discusses the construction process and technical scheme of highway bridge prefabricated T beam, aiming to improve the safety level of overall highway construction project and comprehensively improve the construction efficiency of highway T beam.
作者
黎颉
Li Jie(Changsha Road&Bridge Construction Co.,Ltd.,Changsha,Hunan 410000)
出处
《工程技术研究》
2022年第11期63-65,共3页
Engineering and Technological Research
关键词
高速公路
桥梁施工
预制T梁
智能张拉
highways
bridge construction
prefabricated T beam
intelligent tensioning