摘要
对酒钢选矿厂一选、二选工序综精测算烧结矿品位、SiO_(2)含量、S含量、K_(2)O含量完成情况进行充分调查分析,制定针对性的改进措施。一选、二选综精测算烧结矿品位、SiO_(2)含量呈现改善趋势,达标率完成计划,S含量、K_(2)O含量呈现显著下降趋势,完成计划控制目标。
A thorough investigation and analysis were conducted on the comprehensive refining of sintered ore grade,SiO_(2)content,S content,and K_(2)O content at the first and second processing stages of JISCO mineral processing plant.Targeted improvement measures were formulated.The comprehensive refining calculation of sintered ore grade and SiO_(2)content showed an improving trend,with the compliance rate meeting the plan.S content and K_(2)O content showed a significant downward trend,achieving the planned control targets.
作者
涂威
赵国庆
Tu Wei;Zhao Guoqing(Mineral Processing Plant of Hongxing Steel Co.Ltd.,Jiuquan Iron and Steel(Group)Corporation,Jiayuguan,Gansu,735100)