摘要
随着治水进程的推进以及《深圳市水务发展“十四五”规划》的实施,对污染雨水控制体系提出了新要求,初小雨调蓄池在该体系发挥了重要作用。新陂头河干流调蓄池是光明区“源头收集、过程调蓄、末端处理”初期雨水污染控制路线的重要组成部分,以该调蓄池为例,对初小雨调蓄池的进水控制、内部分格、智慧运维和就地处理等方面提出优化思路和对策。同时,结合未来水务发展和雨洪管理需求,提出调蓄池梯级利用方案,可为类似工程提供指导和借鉴。
With the advancement of water management initiatives and the implementation of Shenzhen’s“14th Five-Year”Plan for Water Development,new requirements have emerged for the urban stormwater pollution control system.The initial light rainwater storage tank serves as an important component for this system.The trunk stream storage tank of Xinpitou River plays a crucial role in the initial rainwater management route of Guangming District,which follows the approach of“source collection,process storage,and end treatment”.Using this facility as a case study,this paper proposed optimization strategies and countermeasures for initial light rainwater storage tanks focusing on influent regulation,internal division,intelligent operation and maintenance,and on-site treatment.Furthermore,a cascade utilization scheme for storage tanks to serve as a guideline and reference for similar projects was proposed in conjunction with future requirements for water development and stormwater management.
作者
何磊
HE Lei(Shanghai Municipal Engineering Design Institute<Group>Co.Ltd.,Shanghai 200092,China)
出处
《中国给水排水》
北大核心
2025年第8期77-82,共6页
China Water & Wastewater
关键词
初小雨调蓄池
设计优化
梯级利用
径流污染
initial light rainwater storage tank
design optimization
cascade utilization
runoff pollution