摘要
近年来,茅洲河流域水污染治理工作得到大力推进,水环境质量逐步改善,但初期污染雨水问题严重制约其水环境质量进一步提升。深圳市光明区楼村湿地公园工程(设计规模3000m3/d)将初期污染雨水引入人工湿地进行处理,高效完成了初期污染雨水的就地收集、调蓄、处理和回用,既解决了当前的黑臭问题,又巧妙地打造了兼具污水处理功能和景观特色的海绵主题湿地公园。详细介绍了该工程截流系统、污水处理系统、海绵系统、湿地景观系统的设计方法。
In recent years,the water pollution control in Maozhou River basin has been vigorously promoted,and the water environment quality has been gradually improved.However,the problem of initial polluted rainwater seriously restricts the further improvement of the water environment quality.The Loucun wetland park project in Guangming District,Shenzhen(design scale of 3000 m~3/d)introduces the initial polluted rainwater into the constructed wetland for treatment,and effectively completes the on-site collection,storage,treatment and reuse of the initial polluted rainwater,which not only solves the current black and odorous problem,but also cleverly creates a sponge theme wetland park with sewage treatment function and landscape characteristics.This paper introduced the design methods of intercepting system,wastewater treatment system,sponge system and wetland landscape system of the project in detail.
作者
何磊
吴克祥
邹伟国
HE Lei;WU Ke-xiang;ZOU Wei-guo(Shanghai Municipal Engineering Design Institute<Group>Co.Ltd.,Shanghai 200092,China)
出处
《中国给水排水》
CAS
CSCD
北大核心
2023年第18期77-83,共7页
China Water & Wastewater
关键词
初期污染雨水处理
人工湿地
景观
initial polluted rainwater treatment
constructed wetland
landscape