摘要 在水布垭电厂机组扩修改造项目完成后,对4台主变压器进行维护检修。在检修过程中,识别出一系列新的问题,对这些问题进行全面的原因分析,并针对发现的具体问题提出定制化的解决方案。同时,对主变压器进行油中溶解气体分析和油简化分析试验,并对比大修前后的性能数据,以确保主变压器的可靠性。 After the completion of the unit expansion and modification project at Shuibuya Power Plant,maintenance and overhaul work was carried out on four main transformers.During the overhaul process,a series of new issues were identified.A comprehensive cause analysis was conducted for these issues,and customized solutions were proposed for the specific problems found.At the same time,dissolved gas analysis and simplified oil analysis tests were performed on the main transformers.The performance data before and after the overhaul were compared to ensure the reliability of the main transformers.
作者 欧阳子帅 OUYANG Zishuai(Hubei Qingjiang Hydropower Development Co.,Ltd.,Yichang,Hubei 443000,China)
出处 《自动化应用》 2025年第5期262-264,270,共4页 Automation Application
关键词 水布垭电厂 扩修改造 主变压器 大修 Shuibuya Power Plant expansion and modification main transformer overhaul
  • 相关文献

参考文献3

二级参考文献7

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部