摘要
对110 kV内桥接线变电站的备自投装置展开了研究,论述了备自投装置的基本要求和逻辑原理。针对变电站轻载状态下备自投装置易误动作的问题,结合两起相关案例,提出了完善电压回路设计和增加额外启动条件两个改进方向,并提出了相应的改进方案。
This article conducts research on the backup power automatic switching device of 110 kV internal bridge connection substation,and discusses its basic requirements and logical principles.In response to the problem of mistaken actuation of backup power automatic switching device under light load conditions in substations,this article analyzes two relevant cases,proposes two improvement directions,namely"improving voltage circuit design"and"adding additional starting conditions",and proposes corresponding improvement plans.
作者
施鲁强
汪柏松
张莞嘉
樊世伟
SHI Luqiang;WANG Baisong;ZHANG Wanjia;FAN Shiwei(State Grid Zhejiang Electric Power Co.,Ltd.Hangzhou Power Supply Branch,Hangzhou 310000,China)
出处
《电工技术》
2024年第24期160-162,共3页
Electric Engineering
关键词
备自投装置
误动作
电压回路
高压带电显示装置
backup power automatic switching device
mistaken actuation
voltage loop
high voltage live display device