广饶县南堤水库增容工程“六项机制”创新实践

The Innovative Practice of"Six Mechanisms"in the Construction of Nandi Reservoir Capacity Expansion Project in Guangrao
在线阅读 下载PDF
导出
摘要 2022年7月,水利部印发《关于构建水利安全生产风险管控“六项机制”的实施意见的通知》。2023年4月,广饶县南堤水库增容工程作为“六项机制”在建水利工程项目省级试点,坚持风险预控、关口前移,分级管控、分类处置,源头防范、系统治理,基本实现安全生产全链条全方位管控,有效防范生产安全事故。本文梳理了试点创建经验做法,在分析现有问题基础上,提出措施建议,以期为相似水利工程安全施工提供借鉴。 In July 2022,the Ministry of Water Resources issued the Notice on the Implementation Opinions of the"Six Mechanisms"for the Construction of Water Safety Production Risk Control.In April 2023,the Nandi Reservoir expansion project in Guangrao County was taken as a provincial pilot project of"six mechanisms"under construction water project.It adheres to pre-control on risk,priority on key issues,hierarchical control,classified disposal,source prevention and systematic improvement.It realizes the all-round control of the whole chain of safety production roughly,and effectively prevents production safety accidents.This paper reviews the experience and practice of pilot creation.Based on the analysis of the existing problems,the paper puts forward some measures and suggestions in order to provide reference for the safe construction of similar water projects.
作者 董华东 宋茂琪 刘福生 DONG Huadong;SONG Maoqi;LIU Fusheng(Water Resources Engineering Company of Guangrao County,Guangrao,Shandong 257300,China;Water Affairs Service Center of Guangrao County,Guangrao,Shandong 257300,China)
出处 《山东水利》 2024年第12期50-51,55,共3页 Shandong Water Resources
关键词 广饶县 安生生产 南堤水库 增容工程 Guangrao County Safety production Nandi Reservoir Capacity enhancement works
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部