摘要
为减小复杂地质环境情况下的地下障碍物清障及灌注桩施工对周边环境的影响,依托上海市黄浦区露香园项目一期工程B2、B3地块,探讨了复杂地质环境下微扰动清障技术在灌注桩施工中的应用。工程实践表明,采用全回转钻机进行微扰动清障施工,对周边环境的影响较小,对今后类似工程具有一定的借鉴作用。
To minimize the impact of underground obstacle removal and bored pile construction on the surrounding environment under complex geological conditions,the application of a micro-disturbance obstacle removal technique is explored based on the B2B3 plot of the Luxiangyuan Project Phase I in Huangpu District,Shanghai.Engineering practice demonstrates that the use of a full rotary drilling rig for micro-disturbance obstacle removal has minimal impact on the surrounding environment and provides a valuable reference for similar future projects.
作者
彭伟炯
蒋贝毅
PENG Weijiong;JIANG Beiyi(Shanghai Construction No.7(Group)Co.,Ltd.,Shanghai 200050,China)
出处
《建筑施工》
2024年第12期2094-2096,2100,共4页
Building Construction
基金
上海建工集团股份有限公司重点科研项目(22JCSF-09)。
关键词
清障施工
微扰动
复杂地质
全回转钻机
obstacle removal
micro-disturbance
complex geology
full rotary drilling rig