期刊文献+

太原市晋源东区纬三段综合管廊工程模板台车施工技术分析

Analysis on Formwork Trolley Construction Technology for Weisan Section Comprehensive Pipe Gallery Project in East Jinyuan District of Taiyuan City
在线阅读 下载PDF
导出
摘要 目前,我国已经广泛开展了地下综合管廊工程的施工建设,存在着各式各样不同的施工方法。文章针对太原市晋源东区纬三段综合管廊工程,首先介绍其结构概况,并对模板台车的装配与使用进行论述,具体从模板台车组装到模板拆除及养护等施工流程要点进行模板台车施工技术分析,且与采用竹胶板和全屋支撑的方法进行经济效益对比,以期使城市地下管廊工程施工进度得到明显改善,同时确保整体施工的质量。 At present, China has widely carried out the construction of underground comprehensive pipe gallery projects, and there are various construction methods. Aiming at the Weisan section comprehensive pipe gallery project in East Jinyuan District of Taiyuan City, this paper first introduces its structural overview, and discusses the assembly and use of the formwork trolley. The construction technology of the formwork trolley is analyzed from the construction procedures such as the assembly of the formwork trolley to the removal and maintenance of the formwork, and its economic benefits are compared with that of the method of using bamboo plywood and full house support, in order to make the construction progress of the urban underground pipe gallery project significantly improved, and ensure the quality of the overall construction.
作者 冯金涛 FENG Jintao(The 4th Engineering Co.,Ltd.of China Railway 12th Bureau Group,Xi'an,Shaanxi 710016)
出处 《工程技术研究》 2022年第21期97-99,共3页 Engineering and Technological Research
关键词 综合管廊 模板台车 施工技术 施工质量 comprehensive pipe gallery formwork trolley construction technology construction quality
  • 相关文献

参考文献5

二级参考文献15

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部