期刊文献+

采煤机调高千斤顶失效分析及预防措施

Mechanism Analysis of Cracking Failure for Shearer Height Adjusted Jack
在线阅读 下载PDF
导出
摘要 采煤机是煤矿综采工作面生产过程中的重要设备,其截割滚筒调高千斤顶是否能稳定可靠工作关系到煤矿的安全稳定生产。本文针对煤矿现场采煤机调高千斤顶出现的开裂失效,利用化学成份、力学特性、微观组织分析对调高千斤顶的失效机理进行系统分析,并从焊接工艺及焊后处理等方面提出了有针对性的预防措施。 The Shearer is considered as one of the most important equipment on the coal face,any failure of the height adjusted jack in the shearer may impact the safety of the coal mine production.This paper adopt chemical composition method,mechanical properties and microstructure testing to analysis the cracking failure mechanism of the large diameter jack used in coalmine,and puts forward the corresponding preventive measures from the aspect of welding technology and post-weld treatment.
作者 徐志鹏 刘晟 万宏凤 XU Zhi-Peng;LIU Sheng;WAN Hong-Feng(School of Intelligent Manufacturing,Jiangsu Vocational Institute of Architectural Technology,Xuzhou Jiangsu221116,China;Zhengzhou Coal Mining Machinery Group Co.,Ltd.,ZhengzhouHenan450016,China;Zhengzhou Technical College,Zhengzhou Henan450010,China)
出处 《机电产品开发与创新》 2022年第6期88-90,共3页 Development & Innovation of Machinery & Electrical Products
基金 江苏省“333高层次人才培养工程” 江苏省高校自然科学研究面上项目(16KJB460027)。
关键词 采煤机 调高千斤顶 失效分析 焊接工艺 Shearer Height adjusted jack Failure analysis Welding technology
  • 相关文献

参考文献19

二级参考文献104

共引文献92

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部