文章结合营盘山隧道斜井工区出现的涌水突泥情况,从微观及宏观机理方面对隧道涌水机制进行了分析,探究隧道涌水原因,并结合相关工程实际情况及理论得到该隧道的涌水机制。根据隧道超前地质预报结果,结合相应涌、积水量计算理论对隧道涌、积水量进行总结计算,得到不同理论条件下的隧道涌水量,为后续隧道涌水治理及加固提供了相应的理论基础。
Based on the water inrush and mud inflow in the inclined shaft working area of Yingpanshan Tunnel, this paper analyzes the tunnel water inrush mechanism from the micro and macro mechanisms, and explores the reasons for the tunnel water inrush. Combined with the actual situation and theory of related projects, the water inrush mechanism of the tunnel is obtained. According to the advance geological prediction results of the tunnel, the volume of water inrush and water accumulation of the tunnel is summarized and calculated in combination with the corresponding water inrush and water accumulation volume calculation theory,and the water inrush volume of the tunnel under different theoretical conditions is obtained, which provides the corresponding theoretical basis for the subsequent treatment and reinforcement of tunnel water inrush.
作者
郜现磊
Gao Xianlei(China Construction Seventh Engineering Division Co.,Ltd.,Zhengzhou,Henan 450016)
出处
《工程技术研究》
2022年第10期230-232,共3页
Engineering and Technological Research
关键词
隧道
涌水
突水
tunnels
water inrush
water inflow