期刊文献+

基于精益生产的产线布局改善 被引量:8

Improvement of Production Line Layout Based on Lean Production
在线阅读 下载PDF
导出
摘要 当操作员在生产设备之间进行大量的移动或搬运物料时,会产生不必要的搬运和行走浪费,这些浪费将严重影响企业运营效率和生产成本。制造业的生产线布局形式,直接关系到企业的运行效率。以精益生产理论为指导,运用系统设施布置方法对D公司机轮小修生产线布局进行改善,减少物品搬运距离、路线交叉和步行浪费,提高厂房面积有效使用率。在提高生产线机器自动化水平基础上,结合紧凑的U型布局,培养一人多岗能力,减少操作员工数量,降低企业人力成本。
作者 郑德星 陆志强 ZHENG De-xing;LU Zhi-qiang
出处 《精密制造与自动化》 2022年第1期33-36,64,共5页 Precise Manufacturing & Automation
  • 相关文献

参考文献2

二级参考文献14

  • 1Gupta S, Taleb K N. Scheduling disassembly [ J ]. Interna- tional Journal of Production Research, 1994,32 ( 8 ) : 1857 - 1566.
  • 2Gupta S M, Gungor A. Product recovery using a disassembly line:Challenges and solution. Electronics and the Environ- ment. Proceedings of the 2001 IEEE International Symposium on Electronics and the Enviroment [ C]. Denver: [ s. n. ] ,2001 : 36 -40.
  • 3Liu B, Huang S. Research on Disassembly Line Balancing Problem in the Presence of Uncertain Cycle Time. Interna- tional Asia Conference on Industrial Engineering and Man- agement Innovation [ C ]. Berlin Heidelberg: [ s. n. ], 2013 : 497 - 507.
  • 4McGovern S. Gupta S 2-opt heuristic for the disassembly line balancing problem. Environmentally Conscious Manufactur- ing III[ C ]. Bellingham: [ s. n, ] ,2004:71 - 84.
  • 5McGovern S, Gupta S. Ant colony optimization for disassembly sequencing with multiple objectives [ J ]. International Journal of Advance Manufacturing Technology,2006 (30) :481 - 496.
  • 6Kalayei C B, Gupta S M. Ant colony optimization for se- quence-dependent disassembly line balancing problem [ J ]. Journal of Manufacturing Technology Management, 2013, 24(3) :413 -427.
  • 7Kalayei C B, Gupta S M. Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing prob-lem [ J ]. Expert Systems with Applications, 2013(40) : 7231 - 7241.
  • 8Kalayci C B, Gupta S M. A tabu search algorithm for balan- cing a sequence-dependent disassembly line[ J]. Production Planning & Control,2014,25 (2) : 149 - 160.
  • 9Ozcan U, Kellegsz T, Toklu B. A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem[ J]. International Journal of Production Research, 2011,49(6) :1605 - 1626.
  • 10Sirovetnukul R, Chutima P. Multi-objective particle swarm optimization with negative knowledge for U-shaped assembly line worker allocation problems. Industrial Engineering and Engineering Management [ C ]. Macao: [ s. n. ],2010:2033 - 2038.

共引文献14

同被引文献62

引证文献8

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部