摘要 某高压直流换流站运行过程中,极II高端400 kV穿墙套管接头处发生发热现象,对换流站的安全运行构成严重威胁。为防止穿墙套管接头发热造成换流站设备损坏和恶性电气事故的发生,对该起过热现象的原因进行了分析、计算和测试,并制定了相应防范措施,以供同行参考。 During the operation of a HVDC converter station,the heating phenomenon occurred at the joint of 400 kV through wall bushing at the high end of pole II,which posed a serious threat to the safe operation of the converter station.In order to prevent the equipment damage and malignant electrical accident of converter station caused by the heating of through wall bushing joint,the causes of this overheating phenomenon are analyzed,calculated and tested,and the corresponding preventive measures are formulated for reference.
作者 李秀婧 徐友 张意 夏金柱 LI Xiujing;XU You;ZHANG Yi;XIA Jinzhu(Yunnan Electric Power Technology Co.,Ltd.,Kunming 650051,China;Kunming Bureau,CSG EHV Power Transmission Company,Kunming 650000,China)
出处 《电工技术》 2022年第3期47-49,共3页 Electric Engineering
关键词 换流站 穿墙套管 发热现象 故障检测 converter station through wall bushing heatingphenomenon fault detection
  • 相关文献

参考文献3

二级参考文献23

共引文献6

同被引文献46

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部