600 MW机组锅炉后屏过热器泄漏原因分析和预防 被引量:2

Analysis and Prevention of 600 MW Unit Boiler Rear Panel Superheater Leakage
在线阅读 下载PDF
导出
摘要 某电厂600 MW直接空冷机组锅炉后屏过热器泄漏停机处理完成后启动再次泄漏。通过检查和分析,后屏过热器第1次泄漏是由于异种钢焊口焊接质量差,第2次泄漏是由于第1次泄漏停机后未采用热炉带压放水和第2次启动过程中操作不当,导致后屏过热器形成水塞,造成局部短时过热爆管,并提出了消除方法和预防措施。 600 MW direct air cooling unit of a power plant will be started after the treatment is completed due to the leakage and shutdown of the boiler rear screen superheater.Through the inspection and analysis of the rear panel superheater,the first leakage is due to the poor welding quality of the dissimilar steel interface,and the two leakage is due to the undue pressure release from the unheated furnace after the first stop of the furnace and the improper operation in the starting process,resulting in the formation of water plug in the rear panel superheater tube,and causing local short-time overheating detonator in the heat face.After analyzing the causes of the two leaks,the elimination methods and preventive measures are put forward.
作者 赵志宏 黄利明 李焕君 曾红芳 王荣 ZHAO Zhihong;HUANG Liming;LI Huanjun;ZENG Hongfang;WANG Rong(Inner Mongolia Jinglong Power Generation Co., Ltd., Ulanqab,Inner Mongolia 012100,China)
出处 《东北电力技术》 2021年第5期59-62,共4页 Northeast Electric Power Technology
关键词 后屏过热器 泄漏 超温 爆管 异种钢 水塞 rear panel superheater leakage excess temperature tube explosion dissimilar steel water plug
  • 相关文献

二级参考文献4

共引文献24

同被引文献62

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部