晋北煤业5-103工作面过空巷充填技术研究 被引量:1

Study on Filling Technology for Crossing Empty Roadway in 5-103 Working Face of Jinbei Coal Industry Company
在线阅读 下载PDF
导出
摘要 以晋北煤业5-103工作面为研究对象,针对工作面过空巷时巷道围岩变形严重的问题进行了理论分析,并研究了过空巷充填技术的应用,得到高水充填后巷道顶板的最大位移量为141 mm,两帮的最大位移量为94 mm。该技术的应用为安全高效生产提供了重要保障。 Taking the 5-103 working face of Jinbei Coal Industry Company as the research object,this paper carried out theoretical analysis of the problem of serious deformation of the roadway surrounding rock when the working face crossed the empty roadway,and studied the application of the filling technology for crossing empty roadway.It was obtained that the maximum displacement of the roof was 141 mm,and the maximum displacement of the two sides was 94 mm after high water filling.The application of the technlolgy can provide important guarantee for safe and efficient production.
作者 朱占林 ZHU Zhanlin(Jinbei Coal Industry Company,Huozhou Coal Electricity Group,Jingle 035100,Shanxi,China)
出处 《能源与节能》 2020年第10期146-147,186,共3页 Energy and Energy Conservation
关键词 空巷 围岩变形 高水充填 empty roadway surrounding rock deformation high water filling
  • 相关文献

参考文献4

二级参考文献14

共引文献126

同被引文献7

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部