露天矿疏干降水数值模拟及优化分析 被引量:5

Numerical simulation and optimization of open-pit mine dewatering scheme
在线阅读 下载PDF
导出
摘要 根据朝阳露天矿水文地质勘探、抽水试验资料、矿山实际疏干排水量与地下水动态观测,建立了矿区三维地下水数值模拟模型,确定了地面降水孔降水、采场内水平放水孔排水、泄压坑排水等多种方式联合的综合疏干降水方案,并运用地下水数值模型进行模拟预测和方案优化。预测结果表明提出的“降水孔-水平孔-泄压坑”排水方案是高效可行的,模拟得到最大矿区排水量为45000m3/d。研究成果可为矿区降水方案设计提供依据。 Based on groundwater level and dewatering rate monitoring as well as the regional hydrogeological investigation and pumping tests at Chaoyang open-pit coal area,the numerical groundwater simulation model is developed to analyze the dewatering schemes.The integrated scheme,with considerations of ground dewatering wells,horizontal dewatering wells and dewatering hole,is proposed for different periods of mining.The simulation results illustrates that the scheme is feasible and effective for the dewatering systems.The maximum dewatering rate simulated is approximately 45000m3/d.The research results can provide the basis for dewatering scheme design of the coal mining area.
作者 刘先彪 臧彦超 李静 LIU Xian-biao;ZANG Yan-chao;LI Jing(Chaoyang Open-pit Coal Mine of Shenhua Guoneng Baoqing Coal Electrochemical Co.,Ltd.,Shuangyashan 155625,China;Dadi Engineering Development Group Co.,Ltd.,Beijing 100102,China)
出处 《煤炭工程》 北大核心 2020年第9期122-125,共4页 Coal Engineering
关键词 露天矿 疏干降水 地下水模型 Visual Modflow open-pit mine dewatering ground water model Visual Modflow
  • 相关文献

参考文献14

二级参考文献141

共引文献106

同被引文献50

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部